Duyen Hai 3 Thermal Power Plant Project - Extension

Project name:           Duyen Hai No.3 Thermal Power Plant (Extension)

Location:                  Tra Vinh province, Vietnam

Clients:                     Mitsui Engineering & Shipbuilding Co., Ltd

Contract Value:        VND333.000.000.000

Scope of work:          Laying Cooling Water Pipes offshore for the Plant

Construction time:   31 December, 2016 - 15 April, 2018

 

The Plant uses coal in pulverized combustion boiler to achieve high efficiency, stability, safety and requirements for environmental protection due to state-of-the-art equipment. Essentially the plant operates at base load during dry season and intermediate load in wet season.

After finishing the plant will be connected to national grid at 500kV voltage to contribute a part in power supply for the Southern region from 2018 and help to reduce grid dependency to hydropower, especially in dry seasons and dry years.

 

Photos of the Project:        


IMG_0045.JPG


IMG_0029.JPG


IMG_0006.JPG


IMG_0106.JPG


IMG_0133.JPG


IMG_0188.JPG


IMG_0138.JPG


IMG_0295.JPG


IMG_20161007_083055.JPG


DJI_0077.JPG


VINAINCON'S 20-YEAR HISTORY
POWER CONSTRUCTION COMPANY LIMITED NO.4 (PCC4)
THU DUC CENTRIFUGAL CONCRETE JSC (TDC)